[T]he report’s executive summary certainly gets to the heart of their findings.

“The rhetoric from small modular reactor (SMR) advocates is loud and persistent: This time will be different because the cost overruns and schedule delays that have plagued large reactor construction projects will not be repeated with the new designs,” says the report. “But the few SMRs that have been built (or have been started) paint a different picture – one that looks startlingly similar to the past. Significant construction delays are still the norm and costs have continued to climb.”

You are viewing a single thread.
View all comments View context
20 points

To add to this: A certain type of Soviet submarine used a lead-bismuth alloy as coolant for their reactor. The coolant solidifies at ambient temperature so it had to be heated indefinitely by some way or another or else it solidified and trashed the reactor. I don’t think any of them exist anymore since Russia wasn’t able to afford sustaining the giant navy after the Soviet collapse.

Just goes to show how insane nuclear submarine engineering is, or was at some point.

permalink
report
parent
reply

Technology

!technology@lemmy.world

Create post

This is a most excellent place for technology news and articles.


Our Rules


  1. Follow the lemmy.world rules.
  2. Only tech related content.
  3. Be excellent to each another!
  4. Mod approved content bots can post up to 10 articles per day.
  5. Threads asking for personal tech support may be deleted.
  6. Politics threads may be removed.
  7. No memes allowed as posts, OK to post as comments.
  8. Only approved bots from the list below, to ask if your bot can be added please contact us.
  9. Check for duplicates before posting, duplicates may be removed

Approved Bots


Community stats

  • 16K

    Monthly active users

  • 12K

    Posts

  • 551K

    Comments