[T]he report’s executive summary certainly gets to the heart of their findings.

“The rhetoric from small modular reactor (SMR) advocates is loud and persistent: This time will be different because the cost overruns and schedule delays that have plagued large reactor construction projects will not be repeated with the new designs,” says the report. “But the few SMRs that have been built (or have been started) paint a different picture – one that looks startlingly similar to the past. Significant construction delays are still the norm and costs have continued to climb.”

You are viewing a single thread.
View all comments View context
2 points

Theoretically the main advantage of the thorium is precisely because its safer and cleaner. When removed from its neutron source thorium quickly ceases fission and decay.

permalink
report
parent
reply
12 points

“Theoretically” is worth very little. It is pretty much the same for every concept NPP, that once construction starts on an actual practical plant, ugly problems start coming up all over the place that were not considered or thought of in the concept stage. Corrosion is one of the biggest ones.

See also the Rickover memo.

permalink
report
parent
reply

Technology

!technology@lemmy.world

Create post

This is a most excellent place for technology news and articles.


Our Rules


  1. Follow the lemmy.world rules.
  2. Only tech related content.
  3. Be excellent to each another!
  4. Mod approved content bots can post up to 10 articles per day.
  5. Threads asking for personal tech support may be deleted.
  6. Politics threads may be removed.
  7. No memes allowed as posts, OK to post as comments.
  8. Only approved bots from the list below, to ask if your bot can be added please contact us.
  9. Check for duplicates before posting, duplicates may be removed

Approved Bots


Community stats

  • 16K

    Monthly active users

  • 12K

    Posts

  • 551K

    Comments