@matthewtoad43 @MattMastodon @BrianSmith950 @Pampa @AlexisFR @Wirrvogel @Sodis

You seem to assume that only one reactor will be built at a time, and nothing learned. But that’s not how you do it, and not how France already did it, obviously.

I have a little problem understanding how one can acknowledge the success of the Messmer plan and at the same time claim it unrepeatable.

permalink
report
parent
reply

@matthewtoad43 @MattMastodon @BrianSmith950 @Pampa @AlexisFR @Wirrvogel @Sodis

Anyway, I don’t want anyone to stop building renewables, but I don’t want anyone to stop building nuclear either. We need every option.

(Even if nuclear is a safer bet.)

permalink
report
parent
reply

@matthewtoad43 @MattMastodon @BrianSmith950 @Pampa @AlexisFR @Wirrvogel @Sodis

Ah, but historically, France is not an outlier. Here are the largest 10-year deployments of clean energy sources. The green ones are nuclear.

Nuclear doesn’t take long.

Here is an overview of historic build times.

The task is not fearing we might get a bad case, but creating an environment in which we get a good one.

permalink
report
parent
reply

@matthewtoad43 @MattMastodon @BrianSmith950 @Pampa @AlexisFR @Wirrvogel @Sodis

If you don’t have power output from storage equal to *PEAK* demand, it’s the same argument for any storage. And storage doesn’t /produce/ energy, it /consumes/ it (because of conversion losses, which are significant).

permalink
report
parent
reply

@matthewtoad43 @MattMastodon @BrianSmith950 @Pampa @AlexisFR @Wirrvogel @Sodis

At least Germany never had subsidies for commercial nuclear power.

On the other hand, »renewables« are still subsidized heavily, and there is much moaning right now because the build-out is slowing down, as the best places are taken.

And France has no /real/ problem with its riverside plants. Last year (much bemoaned) had 0.05% (one twentieth of a percent) curtailing for river temperatures.

permalink
report
parent
reply

@matthewtoad43 @MattMastodon @BrianSmith950 @Pampa @AlexisFR @Wirrvogel @Sodis

Nuclear is faster at load following than everything but pumped hydro and (very dirty) gas peakers. It was even a design requirement for the german Konvoi type in the 70s and 80s.

permalink
report
parent
reply

@matthewtoad43 @MattMastodon @BrianSmith950 @Pampa @AlexisFR @Wirrvogel @Sodis

Again, £50 per MWh is at current penetration levels of volatiles. This doesn’t scale linearly.

See that you get to more-of-the-same-kind nuclear reactors. This does.

permalink
report
parent
reply

@matthewtoad43 @MattMastodon @BrianSmith950 @Pampa @AlexisFR @Wirrvogel @Sodis

You seem to argue that our /current/ fossil grid would also need more storage, but it works just fine as is. Nuclear is better at load following than fossils, so what gives?

permalink
report
parent
reply

@matthewtoad43 @MattMastodon @BrianSmith950 @Pampa @AlexisFR @Wirrvogel @Sodis

https://en.wikipedia.org/wiki/Load-following_power_plant#Nuclear_power_plants

For a grid of 100 GW peak demand, you either need

- 100 GW nuclear plants, or

- 100 GW storage output, plus (100 GW × storage loss factor) storage input (volatiles or whatever), plus additional transmission capabilities, or

- a combination of 60% nuclear plus, say 10% hydro, plus 30% volatiles

I’d say some variation on the last looks most plausible to me.

permalink
report
parent