Stenciling says “6 & 7TH / PDE & 3RD” It’s the only pink tie on this track.

You are viewing a single thread.
View all comments
36 points

It’s marking the joint between two track segments. Look just above it. On both tracks there’s a series of bolts indicating that two track segments have been bolted together.

Not sure why the other joints aren’t marked.

permalink
report
reply
12 points
*

if that was an insulated joint for track circuit separation there would be cables attached at each side and the two bolted plates would be aligned?

permalink
report
parent
reply
12 points

You can see 3-4 wires connected on either side of the plates.

I’m not sure if those particular plates are insulating connections though. Doesn’t really look like it, but I’m no expert on rail connections.

permalink
report
parent
reply
4 points
*

good spot, those wires are smaller than I am used to seeing - so it is a track circuit boundary as well as whatever the pink means.

permalink
report
parent
reply
11 points

Rail is most often welded together, not joined like this.

So you likely don’t need more than one marking.

permalink
report
parent
reply

What is this thing?

!whatisthisthing@lemmy.world

Create post

Let us help you identify that mysterious object you’ve found.

Currently in CHALLENGE mode: If you’ve got something obscure knocking about, post a picture, and let’s see how we do. Please prefix such posts with “CHALLENGE:” so we know we’ve got a fighting chance.

Community stats

  • 499

    Monthly active users

  • 135

    Posts

  • 1.7K

    Comments

Community moderators