Stenciling says “6 & 7TH / PDE & 3RD” It’s the only pink tie on this track.
You are viewing a single thread.
View all comments 16 points
It appears to have been painted after it was placed and after the track was laid. If you zoom you can see the paint does not run under the rails. Also there is paint on the rail clip that ties the rail to the sleeper. The bolted connection is called a fish plate I think.
1 point