First U.S. nuclear reactor built from scratch in decades enters commercial operation in Georgia::ATLANTA — A new reactor at a nuclear power plant in Georgia has entered commercial operation, becoming the first new American reactor built from scratch in decades.
You could probably fit all of the nuclear waste America produces in few trucks. It’s not as much as people think.
The Department estimates that continued operation of the current fleet of nuclear power reactors could ~70,000 metric tons of uranium * increase the total inventory of spent fuel from 70,000 metric tons of uranium to 140,000 metric tons of uranium. Nearly all of this spent fuel is being stored at the reactor sites where it was generated, either submerged in pools of water (wet storage) or in shielded casks (dry storage). The Dept of Energy
Those must be some big fucking trucks. And as far as I know, only Finland has actually developed any long-term storage which could be considered safe.
Nuclear is fine, but nuclear fanboi takes are similar to weed fanbois, it’s not a perfect solution.
The question of nuclear waste, hammered home by the anti-nuclear crowd, has long since been answered. And the answer is: it’s far from being a problem.
As for the cost of storage and decommissioning, it makes no sense if we do not give a financial order of magnitude.
At French current electricity price, a 915MW reactor will produce 1.1 billion euros of electricity over one year. A 1500MW reactor will produce 1.8 billion euros of electricity over one year.
When you sell 60 billions of euros worth of electricity per year for 60 years, even if you pay 50 billions for storage and 2 billions to decommission an entire plant, it’s still quite profitable.