This wall was to the supply room with all of the uniforms and PPE. The building was constructed in the mid-20th century so it turns out it’s full of asbestos. Thanks mole man.

You are viewing a single thread.
View all comments View context
6 points
*

It’s a slow process for sure and if someone has to nail a picture to a wall they have to call my boss with 2 days turnaround time for a test

permalink
report
parent
reply