Not exactly a woodworking question, but related. I bought an old house and there’s a nice spot in the basement for me to set up my shop, but it’s completely unfinished. Cinder block walls and concrete floor. As far as I know, if I want to actually finish it, I need a permit and inspections, which seems like a lot of hassle. All I really want is to seal the floor (not sure how best to do that) and have a way to hang cabinets. Do I just drill into the cinder block? It feels weird to put a bunch of holes in the foundation of the house. Or do I put up some basic framing to hang things off of? Or does that start to require permits? Any advice? Just not sure how best to proceed.

1 point
*

I did up my garage by first lining the walls with 18mm construction ply (on 2x1s) and the (rough concrete) floor with cheap 4mm ply and speed nails. Ten years and about four or five major redesigns later, I feel it was well worth it for the convenience of being able to hang whatever wherever, whenever, quickly. And the floor was a fast fix, allowing me to easily roll various heavy things around. It’s also quite bright (bare block had the place looking like a dirty, dingy dungeon). The 2x1s allowed for easily rewiring and adding plenty of new sockets, very tidy.

permalink
report
reply
2 points

I have a hobbiest’s woodshop in a portion of my unfinished basement. No cabinets, but I do have a 15 foot or so long workbench with a miter saw in the middle of it. It has a few pull out shelves and this gives me a lot of storage. I also have a very overbuilt 4’x5’ table on wheels that has two shelves below the top. I initially intended this to be an outfeed table for my table saw. My basement has a drop ceiling, painted cement walls, and a linoleum floor.

Others have touched on permits and framing, so I’ll leave that alone.

Dust collection and air filtration are going to be must dos. I have the harbor freight dust collector connected to both my table saw and my miter saw via eye with blast doors so I can funnel 100% of available flow to the tool in use. The miter itself sits inside a pretty large hood. This works fairly well, but it’s not perfect. You’re going to want to build some kind of filter box (a cube or rectangle with filters on four sides and a fan pulling air through them, into the box, and out). Here’s an example.

permalink
report
reply
1 point

I guess I hadn’t really considered just building tall cabinets instead of hanging things, that’s probably the simplest of all. I have dust collection taken care of, but ventilation is on my list. There’s a door and two (terrible) windows, so I can make it happen, but it’s not there yet. I am also thinking of adding a vent to the ductwork that runs through the room, but without insulation, that seems like it might do more harm than good.

permalink
report
parent
reply
4 points
*

Building permits are a thing because people who don’t know what they are doing would create dangerous conditions.

Permit or not, make sure you do your research first.

I’ve had to fix so many home “improvements” that I usually suggest people don’t go at it alone.

permalink
report
reply
10 points

I agree that framing it is the right way to do it. You might not need a permit if you’re not closing up the framing and aren’t planning to run new electric lines. Check with your local permit office. They will be happy to tell you what is and is not required. They are not police, so they aren’t going to do any investigations later on.

Framing for something like that isn’t too tough if you’re a semi-decent woodworker. Youtube should have enough info. Just do the framing correctly so that if you want to do proper finishes later you’ll already have it.

For the floor, it is probably better to leave it unsealed. Properly sealing a concrete floor is not trivial and doing it wrong can cause bigger problems. If you don’t want to work directly on concrete, consider some interlocking foam/rubber squares.

permalink
report
reply
2 points

Okay, all good info. I will eventually want to run more electric, but I’ll hire someone for that. I’ll have to check on the framing and see if permits are required, the actual process seems easy enough.

permalink
report
parent
reply
4 points

If the walls are framed and open, it’s pretty simple and easy for new lines to be run. Shouldn’t be too expensive to hire an electrician for that. However, code may require that you close the walls after that or you may have to use a particular kind of junction box if you want to keep the walls open. Any electrician you hire should know what is required, and they should be handling all of there permits. Always make your contractors pull their own permits.

Also, don’t be too afraid of permits. In your area you may be allowed to do some work and get the permits yourself. Again, ask the local office, they can be your friends.

permalink
report
parent
reply
2 points

I wanted to do the same to my house but never went through with it due to time, expense and my health.

Biggest issue I had to deal with immediately was ventilation and keeping the air clean.

Second issue was noise.

I was going to insulate the ceiling not for heating but for sound proofing and that led to thinking of sealing and keeping the free air in the basement. After that was going considering how to circulate and maintain air in the basement and away from the living area upstairs.

permalink
report
reply

Woodworking

!woodworking@lemmy.ca

Create post

A handmade home for woodworkers and admirers of woodworkers. Our community icon is a planter box made by @Captain Aggravated, the winner of our summer '24 woodworking contest. Congratulations!

Community stats

  • 383

    Monthly active users

  • 318

    Posts

  • 2.6K

    Comments

Community moderators