Stenciling says “6 & 7TH / PDE & 3RD” It’s the only pink tie on this track.
Breast Cancer Awareness Month
It’s the starting block for the train relay races.
To promote awareness and inclusiveness.
Lmao at that completely ineffective ladder lock…
One side’s harder to climb I guess.
They were saying the cover is ineffective since you can just climb up the back
It’s marking the joint between two track segments. Look just above it. On both tracks there’s a series of bolts indicating that two track segments have been bolted together.
Not sure why the other joints aren’t marked.
if that was an insulated joint for track circuit separation there would be cables attached at each side and the two bolted plates would be aligned?
You can see 3-4 wires connected on either side of the plates.
I’m not sure if those particular plates are insulating connections though. Doesn’t really look like it, but I’m no expert on rail connections.