30 points

The idea is for it to be really lightweight (or one might say “very light”) in order to make simpler and easier to install tracks that are then much cheaper to build. IIRC they would still have to relocate utilities when installing the tracks so they wouldn’t end up being much cheaper, and they’ve run out of funding because they’re based in the UK and the UK gov doesn’t fund things.

permalink
report
reply
20 points

I like it.

Smaller hopefully means:

  • my route won’t be canceled due to “too few” riders.
  • more total trains with more of them express.
  • neighborhood trains
permalink
report
reply
19 points

Is that… a battery tram?

permalink
report
reply
2 points

There’s a similar system for buses in Geneva. The bus recharges for 20 seconds while the passengers get off and on during stops.

https://www.tpg.ch/en/about-us/tpg-today-and-tomorrow/innovation#tosa-technology+flash-recharges

permalink
report
parent
reply
3 points

Thanks for the link :)

I had heard of battery busses but never battery trams… It feels so weird to do, if you’re already committing to a rail system, is a third rail or over head cabling that much more of an investment? That tram has a battery that’ll need replacing at some point and I am really curious when the cost of replacing batteries will over take cost of a third rail/pantograph system.

This is genuine curiousity, not me just ragging on battery tech

permalink
report
parent
reply
1 point
Deleted by creator
permalink
report
parent
reply
4 points
permalink
report
reply
4 points

I like this too. I think it could be improved with ground power or a switched third rail in the areas where it is accelerating and decelerating. It seems like overhead power is costly complicated in this age of cheap IGBTs.

permalink
report
reply
8 points

It’s battery powered. Each end has a burst charger to top it up, followed by a full charge overnight. It seems like a good balance. You don’t need to lug a huge amount of battery along, and you only need power to a few places, not a continuous overhead line.

It’s main benefit is being lightweight and cheap to install. The rails don’t need support beyond the depth of the road. They are also designed to be removed easily for utility access.

permalink
report
parent
reply
4 points
*

Yeah. I get that. I think it is an excellent design.

By adding a third rail in acceleration and deceleration areas you would greatly increase electrical efficiency and reduce battery requirements. You wouldn’t waste power charging and discharging the batteries during deceleration and acceleration. Additionally, the battery would only need to be able to provide enough power to maintain the speed. This also reduces the weight of the vehicle.

permalink
report
parent
reply
3 points

A 3rd rail massively increases the complexity of the setup. The tracks are shallow and simple. This makes them cheap to install. Adding a 3rd rail hugely increases the complexity, as well as adding safety concerns. It would be cheaper and safer to add additional chargers, mid route.

permalink
report
parent
reply

Trams, Trolleys and Streetcars

!trams_trolleys_streetcars@lemmy.blahaj.zone

Create post

A Community for the interessting world of Trams, Trolleys and Streetcars!

Community stats

  • 810

    Monthly active users

  • 289

    Posts

  • 800

    Comments