I would have lifted up, then pulled the train out, then lowered and pulled manageable quantities.

permalink
report
reply
17 points
*

Actually, everything should be done by crane, but I guess management told them to use the forklifts cuz getting and assembling one on site costs a lot.

permalink
report
parent
reply
4 points

Does a crane cost more or less than this fuck up?

permalink
report
parent
reply
6 points

No, but tell that to Bob from management, who is not an engineer.

I’ve been in situations like that. You just don’t do it. Also, explain why in written form and have that stamped and submitted.

permalink
report
parent
reply
1 point

I’m going to say less. They can do it by hand now!

permalink
report
parent
reply
2 points

Also, at the very least, should’ve had forklifts on opposite sides

permalink
report
parent
reply

There Was An Attempt

!therewasanattempt@lemmy.world

Create post

There Was An Attempt, and they failed.

Share and discuss of when there was a sincere attempt made and they failed.


Rules

All lemmy.world rules apply.

  • Be respectful: No harassment; trolling; spamming; hate speech and use appropriate language.
  • Share relevant content (Failed Attempts)
  • Foster a healthy, constructive community for us to all learn in.
  • Report any rule violations.

More

Check out the Lemmy Discord

More coming soon! Under new development.

Community stats

  • 1.4K

    Monthly active users

  • 49

    Posts

  • 712

    Comments