You are viewing a single thread.
View all comments 10 points
I would have lifted up, then pulled the train out, then lowered and pulled manageable quantities.
2 points
17 points
*
Actually, everything should be done by crane, but I guess management told them to use the forklifts cuz getting and assembling one on site costs a lot.
4 points
6 points
1 point